
(514) 326-9120
5656 Industriel, Montréal-Nord, QC, H1G 3H8
Tool rental: Asphalt iron
Brand, model: ID167 - Easy
Tips and tricks: The minimum asphalt thickness, after compaction, must be 2" (5 cm). Before compaction, the asphalt layer is approximately 2.5" (3 cm).
Data sheet